Case - Ilha S.A Shipyard
The shipment consisted of 10 electrical panels weighing about 1 ton each and with only the possibility to transport in a shipping cargo plane, due to the height of 2.40 meters. If the shipping had not arrived with the necessary urgency, the shipyard would not meet the deadline and it would be penalized by his client with daily fines. The cargo was in Singapore, where there are no many options of cargo planes to Brazil, and those that existed were crowded due to high demand at the moment.
The solution was sending it on a cargo flight to Brussels and making a transfer to another airline until Viracopos. We would still have to transfer the cargo from Viracopos to Rio de Janeiro and this procedure often takes around 2-3 days. So MRM sent his team to the airport of Viracopos to track the arrival of the load and do all the checklist with the handling company and carrier, allowing the reduction in schedule, delivering a total period of 4 days, surpassing customer expectations.